MORE'n'RUPZ Project
-technical requirements-



   SITE REQUIREMENTS
   A stage with P.A. system or any dark room with A/C main supply.
    Minimum size requirements: 20 square meters.

   TECHNICAL REQUIREMENTS
   ( requirements needed on site)
   Audio power amplification system
   2 monitors
   1 video-projector with dv, s/video or rca input  1000 lumen
   2 tables 2x1.5 m.
   2+2 audio Left/right inputs to connect mixers (supplied by the artists)
   Multiple plugs for A/C source (10 slots)


   ASSEMBLING REQUIREMENTS
   build out time: 3 hours
   sound check time: 2 hours
   dismantling time: 3 hours

   PRODUCTION SUPPORT to be supplied by the Organization:
   2 helpers
   1 engineer in charge of safety standards